AQW 4893/10 Written question to the Minister for Regional Development
To ask the Minister for Regional Development to outline the terms of reference for McAdam Design in relation to its survey of the Comber Greenway.
Asked by Naomi Long MLA on 17 February 2010
- Answered
- Written
- Tabled
- 17 February 2010
- Answer due by
- 4 March 2010
- Answered
- 2 March 201013 days after tabling
- Department
- Department for Infrastructure
- Priority question
- No
Answer
As part of its ongoing assessment of the route options for EWAY, Rapid Transit Division require an accurate topographical survey of the possible route alignments. Due to the limited land and road space available, there is a need to determine the likely impact of a public transport / rapid transit corridor on existing land use. Therefore, accurate topographical information regarding existing ground levels, carriageway geometry and location of street furniture is required.
McAdam Design was awarded the commission through DFP Central Procurement Directorate's 'Consultancy Framework Agreement'.
In summary, the Terms of Reference were
The project objective is to provide information to enable Rapid Transit Division to assess the feasibility of a dedicated rapid transit bus network.
The end product Rapid Transit Division requires is an accurate topographical survey as indicated on accompanying drawings. This involves processing of survey data, producing the specified survey report and survey data, 2D and 3D CAD drawings of the ground model plan, long sections and cross sections of the roads in the survey areas.
There is a detailed Survey Specification for the commission a copy of which will be placed in the Assembly Library.